Saturday, November 21, 2020

Kitchen Renovation: Day 12

I'm impressed -- both weeks so far, there have been guys here working all day Saturday. 

Today the electrician was here until 7 pm. He installed the lights in the stacked cabinets:


He also moved some of the ceiling lights (because I wanted them centered a different way), installed the outlets (with USB ports!), changed all the LEDs to a warmer white color, and installed the pendant light over the sink.

No comments: