The paint was done (which, between prep work and actual painting, took most of the week). I am thrilled with how the colors look on the walls! The hallway and CC's new room are a soft gray:
The light fixtures are in. The switchplates and outlet covers are up. Doorknobs are in place. The rooms are looking almost finished (disregard all the detritus in MJ's room).
In the bathroom, the glass shower was installed, and the toilet was put in place.
The garage walls and ceiling were also repainted (from the plumbing that was routed up to the new bathroom). I took the opportunity to reorganize everything in our garage, so everything's neatly shelved and organized; there's much more space for the kids' toys; and all the dangerous tools and yard chemicals are well out of reach. Isn't this a beautiful sight?
And even better: we can both park our cars in the garage. At the same time (which we haven't been able to do for over a month). Huzzah!
I'm holding my breath for carpeting this week!
No comments:
Post a Comment